Main contracting and design and build
Single-point responsibility for cost, programme and quality. We price and build to the employer's requirements and develop the contractor's designed portions through RIBA Stage 5.
- JCT Design and Build
- Contractor's designed portions
- Employer's requirements
New-build residential and mixed use
Apartment buildings, houses and ground-floor commercial space, from nine-home infill sites to schemes of around 100 homes.
- Apartments
- Houses
- Commercial at ground floor
Conversions and heritage
Change of use and retained-façade work, including a church converted to apartments and a Victorian corner pub converted to a 19-apartment hotel.
- Retained façades
- Change of use
- Occupied town-centre sites
Substructure and frame
Groundworks, drainage and reinforced concrete frames, planned with the structural engineer from the start so the frame programme holds.
- Groundworks
- Drainage
- RC frame